威尼斯vns12561-vns7908威尼斯城官网

Wuxi Shi Ding Construction Machinery Co., Ltd.
Provide professional construction basket basket rental accessories, accessories, aerial gondola accessories Chinese  |  English
Contact / us
Wuxi Shi Ding Construction Machinery Co., Ltd.
Contact: Mr. Shaw 13951581789
Tel:0510-88731990
Mail:caryxiao@hotmail.com
          sales@jsdiaolan.com
Mailbox:214000
Other:13301521628
Add:Yangjian Industrial Park,Wuxi,Jiangsu
Hefei Office 15556462922
Website:www.jsdiaolan.com
shop1416847278906.1688.com
problem
Position:主页 > EN > new > problem >

Independent basket skills

After the gondola operators to obtain operating permits issued by the authorities before they operate independently. Gondola operator must operate under the guidance of the master. Post-installation inspection following the test, the basket lease shall ensure delivery of the roof mechanism, the hanging rope weight and should meet the requirements of the power supply voltage is normal, good protection; machinery and equipment properly.

Electric basket
More+
 
Hoist accessories
More+
Cradle operator shall ensure complete and reliable security protection devices, no debris inside the basket. Do not overload the lift basket running test was carried out, confirmed normal before operation. Job found not functioning properly, it should immediately shut down, and to take security measures. Inspection before repair can not continue to be used without professionals.
After the operation, the operator should be cleaned basket, hanging at 3m from the ground, cut off the power, removed the ladder.
上一篇:Environmental security rules used construction basket 下一篇:Special Weather basket construction contingency plans

威尼斯vns12561|vns7908威尼斯城官网

XML 地图 | Sitemap 地图